2017-08-01 Island model V/f controlled micro grid system study

MENG Jie, DING Quan, HUANG Chao(Guodian Nanjing Automation Company Limited, Nanjing 210032, China)

Abstract:This paper introduced lead-acid battery classic first order model and topological structure of charging and discharging circuit. Control method of bidirectional converter under active and positive power source and V/f source accumulation system was studied. Base on the incident of micro grid failure caused by V/f source over-charged, a stable state of charge (SOC) control strategy based on island mode was indicated. Which is keeping low rate charge and discharge by controlling the SOC to slightly fluctuate around threshold. The simulation on EMTDC/PSCAD software proved the effectiveness. This strategy provided a solution for the stability of micro grid under island mode.

lead-acid battery; classic first order model; V/f source accumulation system; PQ source accumulation system; battery state of charge

2017-08-06 Application of variable PID parameter in power plant automatic generation control

YANG Damao(Huaneng International Power Development Company Tongchuan Zhaojin Power Plant, Tongchuan 727100, China)

Abstract:Huaneng International Power Development Company Tongchuan Zhaojin Power Plant’s 2×600 MW unit main steam pressure seriously surged while increasing load in automatic generation control (AGC) mode. In order to increase the quality of coordinated control of unit,proportion integration and differentiation (PID) parameter module was designed, and properly setting proportional gain and integral time, rapidly increase or decrease load was ensured. And main steam pressure deviation was controlled in allowed range.

Keywords:automatic generation control;main steam pressure;turbine master control; proportion integration and differentiation;proportional gain;integral time

2017-08-10 ARM structure based localized protection device research and application

ZHANG Wen, CHEN Qianglin, XU Dongpo, LI Haiyao(Xuji Group Corporation, Xuchang 461000, China)

Abstract:Intelligent substation localization requires uniformed interface. By integrated design, functions of multiple cards were integrated into a single chip. This required more powerful calculating ability. The process chip based on ARM structure is low power consumption and fast speed, which satisfied the requirement of localized devices. This paper introduced the ARM chip to realize the design and application of localized relay protection device. Based on the IEC 61850 modeling method, a simulation and test system was developed to test the functions and performance of localized devices.

Keywords:intelligent substation; localized; ARM; test system

2017-08-13 Corrosion status investigation and prevention measures of low pressure evaporator in a heat recovery boiler of gas power plant

LI Xiaohui1, SHI Yan1, QIU Zhibin1, ZHANG Jinwen1, GUO Yanjun1, WANG Xinghe2(1.Huadian Electric Power Research Institute, Hangzhou 310030, China; 2.China Huadian Corporation, Beijing 100031, China)

Abstract:In this paper, running conditions and main failure modes of low pressure evaporators in heat recovery boilers of several gas power plants of Huadian Corporation were investigated. The result shows that flow accelerated corrosion (FAC) is the main reason of tube leakage in low pressure evaporators. After that, this paper expounded the corrosion mechanism and its influencing factors of FAC, and proposed some countermeasures from the aspects of design, material selection, operation and maintenance, etc.

Keywords:heat recovery boiler; low pressure evaporator; flow accelerated corrosion; water chemistry; dissolved oxygen

2017-08-17 Experimental study on multi-source industrial steam supply of condensing power unit

CHEN Jian1, LUO Haihua2, YING Jianding1, ZHOU Renmi2(1.Zheneng Taizhou Power Plant Company Limited, Taizhou 318016, China; 2.Zheneng Technology Research Institute Company Limited, Hangzhou 311121, China)

Abstract:This paper introduced the steam extraction transformation scheme of reheat steam and main steam lines for a homemade 300 MW condensing power unit, and through theoretical calculation and experiment, it acquired the extraction flows at low and high temperature parts of reheating pipe under different load conditions for every unit. The study showed that through multi-source industrial steam supply transformation of 300 MW condensing power unit, it realized the maximum heat supply of 1.5 MPa industrial steam per unit up to 170 t/h, which provided a reference for the heating transformations of other 300 MW condensing power units, such as Alstom and Dongfang.

Keywords:condensing power unit; industrial middle pressure steam extraction; reheat steam; main steam; heating transformation

2017-08-21 Addition dosage calculation of second-loop system for AP1000 nuclear power unit

MA Xianqi, XU Wujun, PAN Ronghui(State Nuclear Power Technology Corporation, Shanghai 200233, China)

Abstract:Taking the AP1000 nuclear power unit as an example, this paper calculated the addition dosage of second-loop system in operation mode and shutdown mode of condensate polishing system (CPS), and obtained the theoretical add amounts of ammonia and hydrazine when the unit is running, which provided a reference for the dosing system design and configuration of second-loop of AP1000 nuclear power unit.

Keywords:AP1000 nuclear power unit;ammonia;hydrazine;condensate polishing system

2017-08-24 Power and heat plant absorption pump circulating water waste heat utilization technology and application

WANG Tieshan(Shandong Xinfeng Engineering Company Limited, Ji’nan 250100, China)

Abstract:Heat pump circulating technology and power and heat plant circulating water waste heat utilization was introduced. Absorption pump could use cold source heat loss for urban heat supply. System solved existing problems of power and heat plant centralized heat supply. Take a thermal power plant’s 4×200 MW unit in Hebei Province as example, after applied absorption

Abstracts

heat pump, heat supply increased by 300 GJ/h, annual coal consumption reduced by 34 000 t. Emission of CO2,SO2, NOxand flow gas effectively reduced. Social benefits and economic benefits are outstanding.

Keywords:thermal power plant;absorption heat pump;circulating water;waste heat;heat supple

2017-08-26 Conducting glass fiber reinforced plastics positive electrode maintenance exchange method for non-shell wet type precipitator

ZHOU Ping, YANG Pengfei, FAN Chunyang, LIU Huidong(China Huadian Engineering Company Limited Environmental Protection Branch, Beijing 100160, China)

Abstract:Post-desulfurizationsaturated wet flue gas ion corrosivity. Common anti-corrosion material in China is glass flake or glass fiber reinforced plastics, which are affected by lifetime and installation quality. Electrosparkiscommon while wet precipitator operating. Which caused carbonization at anode or anode breakdown. The non-shell wet type precipitator, independently developed by China Huadian Engineering Company Limited, provided solution for anode support beam, and indicated an anode maintenance method.

Keywords:non-shell wet type precipitator; positive electrode; maintenance and exchange; structure calculation

2017-08-29 Direct air cooling system noise analysis and estimation

CUI Chao(China Datang Technology and Engineering Company Limited, Beijing 100097, China)

Abstract:Noise of direct air cooling system mainly consists of fan group aerodynamic noise and is mainly from dipole. Air cooling island fluid field simulation and noise estimation was carried out based on Fluent acoustics module. Which indicated that Fluent effectively simulated fluid field. To improve environmental influence from direct air cooling system, lowering low frequency noise could be considered.

Keywords:direct air cooling; aerodynamic noise; fluid field analysis; noise evaluation; fans group; low frequency noise

2017-08-32 Reason analysis and prevention measures of inner wall corrosion of a boiler low-temperature reheater

WANG Fengping, LI Jian, ZHAO Aimin(Shandong Huaneng Laiwu Thermal Power Company Limited, Laiwu 271102, China)

Abstract:For the 330 MW subcritical boiler of a certain power plant, two leakage accidents occurred due to the inner wall corrosion of platen reheater and wall type reheater. Combining with the tube cutting inspection on site, sediment test and analysis reports of metallographic and mechanical properties, this paper analyzed the corrosion reason of low-temperature reheater from the aspects of chemical water treatment, operations of boiler startup and shutdown, etc. After that, it proposed the treatment scheme on site and corresponding anti-corrosion measurements.

Keywords:subcritical boiler;low-temperature reheater;inner wall corrosion;leakage

2017-08-36 Failure analysis of air preheater of 350 MW supercritical unit

WANG Lin1, CHEN Suoqun2, GUO Sanhu1, LI Wenjun1, ZHANG Yafu1,WANG Hongyu1(1.Xi’an Thermal Power Research Institute Company Limited, Xi’an 710054, China; 2.North China Power Engineering Company Limited, Beijing 100120, China)

Abstract:Based on Jiantou Chengde Power and Heat Company Limited 350 MW unit, cause of rotary air preheater main shaft stalling failure was analyzed. After internal inspection and flue gas temperature curve analysis, air preheater rotatable parts were conformed function properly. Combined with motor current trend before and after failure, the main cause was determined as transmission part failure. After reducer disassemble inspection, it was found that final drive gear bearing inner race fracture, retainer damage and transmission lost. After changing failed bearing, air preheater returned to normal. Combined with monitoring data, the failure process was reproduced. Preventive advices were provided.

Keywords:350 MW unit; super-critical; air preheater; main shaft stalling failure; bearing failure

2017-08-39 The analysis of condenser vacuum measurement transformation for 600 MW supercritical thermal power unit

LIU Longxiang(Fujian Huadian Kemen Power Generation Company Limited, Fuzhou 350001, China)

Abstract:Taking Fujian Huadian Kemen Power Generation Company Limited, vacuum sampling measurement system in the background of the problems existing in the actual operation, combined with the actual analysis of the reasons. In view of the condenser vacuum measurement system and improvement measures are proposed to improve, effectively improve the accuracy of the condenser vacuum measurement, obtain good actual effect.

Keywords:600 MW; condenser; vacuum;sampling measurement

2017-08-42 Supercritical unit no pump start-up reconstruction analysis

CHEN Yu(Datang Central-China Electrical Power Test Research Institute, Zhengzhou 450000, China)

Abstract:Supercritical unit no start-up circulating pump system and circulating pump start-up system was introduced and compared. Based on a reconstruction of 350 MW supercritical unit start-up system, approach and scope of no-pump start construction was introduced. Which could be referred by similar reconstruction.

Keywords:supercritical; start circulating pump; no-pump system; circulating pump start-up system; transform

2017-08-44 A M701DA type gas-steam combined cycle unit IGV open value improving adjustment

WANG Caiwen(Jiangsu Huadian Qishuyan Generation Company Limited, Changzhou 213011, China)

Abstract:Based on the problem of a M701DA type gas-steam

Abstracts

combined cycle unit exhuast temperature deviated from base value in certain load ranges, and deviated from waste heat boiler optimum design temerature, control logic of compressor inlet guide vent (IGV) was analyzed. The adjustment measurement of IGV was indicated. Turbine exhaust temperature was increased. The objective of to reduced gas turbine generating gas consumption was achieved.

Keywords:compressor; IGV; improving adjustment; generating gas consumption

2017-08-48 BHW35 boiler longitudinal and circumferential weld defect analysis and control

ZHOU Liping(Taiyuan Boiler Group Company Limited, Taiyuan 030008, China)

Abstract:BHW35 steel has notable hardened trend, and cold cracked easily. The treatment of pre-heat and post-weld hydrogen remove was indicated. After analyzing a company's boiler drum longitudinal and circumferential weld, it was proved that proper welding process is essential for defect-free joint.

Keywords:BHW35; cold crack; preheat; hydrogen remove after heating; weld repair

2017-08-50 A type of control oil cooling circuit reconstruction plan and analysis

WANG Dawei(Jiangsu Huadian Qishuyan Generation Company Limited, Changzhou 213000, China)

Abstract:Based on the problem of control oil abnormal high temperature of Jiangsu Huadian Qishuyan Generation Company Limited, maintenance crew inspected and analyzed the cooling circuit and indicated reconstruction plan accordingly. After reconstruction, unit safety was remarkable enhanced.

Keywords:control oil; cooling circuit; oil temperature; plate heat exchanger

2017-08-53 Vietnam Duyen Hai 3 Thermal Power Plant unit No.1 vibration analysis and treatment

HUA Zhaojie(China Chengda Engineering Company Limited, Chengdu 610041, China)

Abstract:The generating unit of Vietnam Duyen Hai 3 Thermal Power Plant was over-vibrating in no-load and normal operating condition. Especially in generator temperature-rise test, the vibration value varied with variation of exciting value. After analysis, unit vibration was mainly caused by rotor imbalance. By site balance adjustment, the problem of over-vibration was effectively solved.

Keywords:dynamic balance; vibration; exciting current; generator

2017-08-55 Turbine supervisory instrument axial displacement signal abnormal cause analysis and treatment

LIU Yafeng, DU Jianchuan, WANG Jiqiang(Huaneng Taiyuan Dongshan Turbine Company Limited, Taiyuan 030043, China)

Abstract:Based on turbine supervisory instrument (TSI) axial displacement survey point deviation, periodic fluctuation and other problems after installation, by analyzing abnormal signal, reconstruction plan was indicated accordingly. Accuracy of unit important survey point was ensued.Reliability of thermal process protection was enhanced.

Keywords:gas-steam combined cycle unit; TSI axial displacement; signal abnormal

2017-08-58 Analysis of a short circuit fault at the low pressure side of excitation transformer of 600 MW unit

WANG Dongya, SHEN Wenhua, CHEN Guanming(Guangdong Zhuhai Jinwan Power Generation Company Limited, Zhuhai 519000, China)

Abstract:In the startup process of No.3 unit of a certain power plant in Guangdong, a short circuit fault took place at the low pressure side of the excitation transformer of self-shunt excitation system, and which caused the tripping of power unit. Through analyzing the curve of fault protection action and the fault phenomenon after disintegrating of excitation transformer, this paper pointed out the fault reason of excitation transformer is insufficient heat dissipation, which led to the aging of insulations in low-voltage coil and interturn, and caused the interturn short circuit of low-voltage coil finally. After that, this paper proposed some repair and improvement suggestions according to the fault reason.

Keywords:excitation transformer;low pressure side;short circuit;protection

2017-08-61 1 000 MW unit condensate pump vibration cause analysis and treatment

ZHU Deqiang, WANG Hui(Guangdong Datang International Corporation Chaozhou Generation Company Limited, Chaozhou 515723, China)

Abstract:The problem of Chaozhou Power Plant 1 000 MW unit condensate pump over-vibration in certain speed range after changing from power frequency to frequency conversion was introduced. Causation was analyzed. After inspection measueremnts, vibrating amplitude was effectively reduced. This plan is simaple and reliable. Which ensured the safety and reliability of condensate pump long-term operation.

Keywords:condensate pump; frequency conversion; vibration; concentricity; inspection

2017-08-64 A gas-fired distributed energy station environment evaluation analysis

JIANG Dongqiao1, SUN Xiaoxu2, KONG Fei2, LIU Yubin2, LIU Jie2(1.China Huadian Coporation Foshan Energy Company Limited, Foshan 528000, China; 2.China Huadian Group Science and Technology Research Institute Company Limited, Beijing 100070, China)

Abstract:Take the distributed energy station reconstruction project in Shanghai as an example, the distributed energy system pollutant emission varying trend was studied. Based on the distributed energy system environmental benefits evaluation model, the environmental benefits and cost of distributed energy system and traditional coal-fired power was analyzed. The study result indicated that, compared with traditional power plant, the envi-

Abstracts

ronmental index of distributed energy system is significantly higher. Environmental cost of distributed energy system is only one-thirteenth of traditional coal-fired power plant. Quantitatively analyzing distributed energy system is not only providing environmental data for control system improvement, but also providing data for the development of distributed energy system.

Keywords:distributed type energy; coal-fired power plant; environmental profit; environment evaluation; cost calculation

2017-08-67 Power plant wet desulfurization tower bottom abnormal scaling analyzing and treatment measurements

YANG Junqiang, XUE Mingchao, YANG Xiaofei, TIAN Wenhui(Guodian Zhumadian Thermal and Electricity Company Limited, Zhumadian 463000, China)

Abstract:A power plant has two units of 330 MW sub-critical coal-fired units, and adopted gypsum-limestone wet type flue gas desulfurization system. Desulfurization system was equipped for each boiler and with one stacker. Abnormal scaling was found in desulfurization system operating. Base on this problem, analysis was carried out, and treatment measurements was indicated. Which is critical for the unit safety, reliability and economic.

Keywords:desulfurization tower; gypsum wet flue gas desulfurization; abnormal scaling

2017-08-70 Cause analysis and solution of slag accumulation at tail end of scraper slag salvaging machine

HE Zhongcai(Liaoning Huadian Tieling Generation Company Limited, Tieling 112000, China)

Abstract:Slag quantity was significantly increased due to worse coal quality, and caused more and more slag accumulation at tail end of scarper slag salvaging machine. By adding spray system, adding tension shaft sleeve, changing slag curtain material and other measurements, unit safety and stability was enhanced, zero non-emergency stop was realized.

Keywords:scraper slag salvaging machine;slag accumulation;tensioning wheel;spray system

2017-08-72 Waste heat boiler flow accelerated corrosion cause analysis and prevention treatment

LU Dingkang, PAN Hao(Jiangsu Huadian Qishuyan Generation Company Limited, Changzhou 213000, China)

Abstract:Waste heat boiler flow accelerated corrosion cause was briefly analyzed. Prevention treatment for boiler heat surface leakage was indicated. Which could be referred for waste heat boiler application and maintenance.

Keywords:waste heat boiler; flow accelerated corrosion; evaporator; temperature; prevention treatment

2017-08-74 Power plant highly suspended and high hardness circulating water sewage reusing technology analysis

CUI Desheng1, LI Wenjie1, GONG Longfei2(1.Huadian Water Engineering Company Limited, Beijing 100070, China; 2. Inner Mongolia HuadianWuda Heat and Power Company Limited, Wuhai 016040, China)

Abstract:This paper introduced the process of a power plant in Inner Mongolia applied coagulation and clarification, immersed ultra-filtration and hyperfiltration to reuse high suspended and high hardness circulating water as circulating water system and boiler feedwater. The technical feature, economic benefits and environmental benefits was analyzed.

Keywords:high suspended solid; high hardness; sewage; reuse; emission reduction

2017年《华电技术》杂志订阅回执 年 月 日

户名:华电技术编辑部

账号:1702020809008902241

开户行:工商银行郑州五里堡支行

《华电技术》编辑部联系方式:

地址:河南省郑州市郑东新区龙子湖湖心岛E2-3-01 邮编:450046

咨询电话:0371-58501044 传真:0371-58501055

E-mail:hdjs-chd@vip.163.com hdjs@chec.com.cn

(复印有效)

猜你喜欢
龙子湖心岛开户行
关于发放作者稿费的声明
湖心岛的黄金
关于《护理与康复》杂志社开户银行变更通知
蚌埠市龙子湖健康评价
湖心岛(外一首)
洪湖行
浅谈企业付款信息变更操作实例
两束鲜花
水中卫士
离婚时如何申请查询对方存款