黏滑错动下地铁隧道结构破坏特征及设防措施

2021-08-06 02:20姜久纯
关键词:围岩分段断层

姜久纯

摘 要:在活断层发育城市的地铁建设过程中,由于线路走向原因,有时不得不穿越活动断层。但目前对于地铁隧道穿越活动断层的设防措施研究较少,尚无成熟的工程经验。文中以新疆乌鲁木齐地铁穿越西山断层工程建设为依托,采用三维数值模拟和室内试验相结合的方法,研究了黏滑错动下地铁隧道结构力学响应及破坏过程,揭示了隧道围岩和衬砌结构的破坏形态与塑性区分布规律。结合工程设计,提出采用隧道衬砌分段和扩大断面尺寸等工程应对措施,可极大减小黏滑错动下的地铁破坏范围和程度,降低工程损失,也能为破坏后的地铁隧道结构修复提供便利条件。研究结论可为穿越活断层的城市地铁隧道结构设防设计提供有益参考。

关键词:断层;黏滑错动;地铁隧道;剪切破坏;模型试验;分段设防

中图分类号:U 231

文献标志码:A

文章编号:1672-9315(2021)03-0474-07

DOI:10.13800/j.cnki.xakjdxxb.2021.0312

Abstract:Due to the line strike,urban subway has to be constructed across active faults.However,little research has been done on the fortification measures of subway tunnel crossing active faults,without any mature engineering experience.Based on the construction of the Xishan fault project of Urumqi Metro,this paper studies the structural mechanical response and failure process of subway tunnel under the stick-slip dislocation of active faults by using the comprehensive method of three-dimensional numerical simulation and laboratory tests,and reveals the failure patterns and plastic zone distribution of tunnel surrounding rock and lining structure.Combined with the engineering design,some engineering countermeasures,such as using tunnel lining section and expanding section size,are put forward,which greatly reduce the scope and degree of subway damage under dislocation,cut down the engineering loss,and provide convenient conditions for the repair of subway tunnel structure after damage.The research results may provide significant reference for the designing of urban subway tunnel structure fortification through active faults.

Key words:fault;stick-slip dislocation;subway tunnel;shear failure;model test;sectional fortification

0 引 言

新疆维吾尔族自治区处于印度洋板块和亚欧板块碰撞的前沿地带,主要有五大地震带。新疆乌鲁木齐市处于西北天山构造带与博格达构造带交汇部位,地质运动强烈且活动断层发育。目前已探明的活动断层有9条,多条断层带上均发生过强震并存在古地震活动,其活动断层数量和规模在全國大中城市是少见的。在修建跨越断层带的隧道工程时,尤其需要关注黏滑错动问题。黏滑错动突发性强,会在较短时间内引起隧道结构弯曲变形,产生塑性区,对活断层附近的衬砌结构造成严重的破坏。因此,隧道穿越断层时采取的设防措施显得尤为重要,相关方面的研究已经成为当前的难点和热点。

国内外学者采用数值模拟、室内试验和现场测试等手段开展了相关研究。GREGOR采用数值模拟研究了隧道结构在穿越断层带时受力情况[1]。LIN等采用现场试验与有限元相结合的方法研究了逆断层中盾构隧道的破坏特征[2]。刘恺等运用数值方法分析了不同倾角和断裂破碎带宽度下隧道位移、结构变形和衬砌内力变化规律[3]。盛越建立三维有限元整体式隧道模型,研究了不同构造的变形缝对隧道受力力学差异和净空扩大量的影响[4]。李林等通过振动台模型试验,提出了优化结构受力变形的抗震组合措施[5]。祁彬溪等运用有限元分析了断层竖向错动速率与断层破碎带交界面动摩擦系数对穿越断层隧道的竖向位移和第一主应力的影响[6]。安韶等基于有限元模型,分析了乌鲁木齐轨道交通2号线的抗断设计流程[7]。崔光耀等基于能量守恒原理结合数值仿真,对错动作用下隧道的抗错断设计方法进行研究[8]。汪振等运用黏性界面模型结合有限元模拟正断层破裂过程,探讨了不同断层错动量和倾角对隧道力学影响规律,建立了隧道安全评价的分类标准[9]。阎锡东等采用属性测度分析理论对隧道塌方、结构失稳风险事件进行了分析,建立了隧道穿越活动断裂带风险评价模型[10]。

综上,在黏滑错动对地铁隧道结构影响方面国内外学者取得了诸多成果,但主要集中在黏滑错动下隧道结构动力响应及破坏机理、结构安全评价方法等[11-14];在抗错动设防措施方面成果较少,特别是结构分段长度、扩大断面尺寸等方面有待深入研究。

基于现场勘探获得的西山活断层的几何和运动特性等关键参数,文中采用数值分析结合室内试验手段,从黏滑错动下地铁隧道结构受力响应及破坏影响入手,研究衬砌分段、扩大断面等措施对提高隧道抗错断性能的影响,并确定其合理设防参数。可为相关地铁隧道的设防设计提供依据。

1 区域地质特征

乌鲁木齐市地处东天山隆起区与北天山强烈隆起区的交汇部位,沉积有巨厚的中、新生代地层。新构造运动和断层活动强烈,受海西运动以来历次构造运动的影响,形成了一系列轴向北东—南西的褶皱和断裂。

地铁2号线在建设过程中,多次穿越活动断层。其中西山断裂北支东段始于苜蓿沟口,向东延伸至耐火材料厂。该断裂走向N45°—70°E,倾向N,倾角44°~83°,具逆冲性质。地铁2号线线路大角度通过西山断裂北支(如图1所示)。

2 西山断裂带地质勘测

乌鲁木齐主城区地表覆盖有深厚的第四系沉积层,给地质勘测工作带来极大的技术挑战。为准确探明断裂带位置与特征,在详细勘察阶段综合采用了地质调查、工程地质钻探、原位测试等方法进行探测[15-18]。地铁站之间联合钻孔柱状图如图2所示。

根据地球物理探测及综合判识的结果,确定西山逆断倾角为58°,与隧道交角28°,断层上下盘相对垂直滑移设防量取0.65 m。

3 黏滑错动下隧道结构力学响应分析

3.1 建模分析

为完整呈现黏滑错动下隧道结构的变形及破坏形态,并消除边界效应的影响,确定模型尺寸为长度250 m,宽度40 m。隧道埋深依据工程实际取为15 m。土体本构关系为理想弹塑性材料,遵循D-P准则,衬砌结构本构关系采用混凝土本构弹塑性模型。

考虑到模拟黏滑错动效果及支护结构与围岩在错动条件下的接触效果,分别在上下盘断层面、初期支护与围岩相触处设置接触单元。建模如图3所示。

在计算参数选取上,穿越西山断层处地层为Ⅴ级围岩,采用注浆措施对围岩加固后,加固区弹性模量、黏聚力大约提高20%~30%。取围岩-初支摩擦系数为0.45,断层面摩擦系数为0.1。具体参数见表1。

3.2 围岩及衬砌结构变形分布规律

西山断层错动作用下地铁2号线隧道围岩与衬砌的竖向变形云图如图4所示。

由图4可知,在黏滑错动后,隧道衬砌结构沿着纵向发生“S”状弯曲变形;下盘仰拱近断层面处出现了明显脱空,由于有限单元法采用连续介质假设,上盘近断层面的拱顶与围岩也出现了脱空。

由于城市浅埋地铁往往围岩条件差,且受到断层破裂面摩擦作用的影响,衬砌结构与周围土体间不一定会出现明显的脱空区,但作用在下盘隧道仰拱及上盘隧道拱顶的围岩压力会有所减小。

3.3 隧道结构塑性区分布规律

在黏滑错动下,隧道结构根据其不同的受力条件会产生相应的弹塑性变形,当其应力超出衬砌材料弹性极限时就会产生塑性区。因而,结构塑性区的范围和大小是判断其受破坏严重程度的重要指标。隧道二次衬砌塑性区分布如图5所示。

从图5可知,上下盘顶底部受压区及断层面周围拱脚至拱腰区域均出现塑性区。塑性应变峰值出现在下盘拱顶处,峰值达到1.058%。

根据塑性区分布特征,选取隧道衬砌结构拱顶和仰拱2个关键部位的计算结果进行分析。其塑性区沿隧道方向的变化规律如图6所示。

拱顶在-115~-35 m的范围内(上盘80 m)、仰拱在-60~60 m范围内(上盘60 m、下盘60 m)存在较大的塑性变形。表明黏滑错动作用对隧道衬砌结构安全性存在较大的影响,需要在此断层面上盘80 m、下盘60 m范围内采取一定的设防措施。

4 黏滑错动室内模型试验

4.1 模型试验设计

基于工程实际,研发了大比例(1∶25)、多倾角、宽控速、高精度穿越断层的隧道结构破坏模拟加载试验装置,采用剪切试验装置(如图7所示)来模拟纵向125 m范围内衬砌结构的破坏演化过程。模型尺寸2 m×2 m×5 m,可在保证对断层错动下地层及隧道结构破坏过程有效监测的前提下,提供更符合实际情况的边界条件。

该隧道剪切模型主要由箱体、水平反力架梁、水平推力源、垂直推力源、推力传动装置5大部分组成。装置采用先进的同步加载系统,既可以精确地进行均衡位移加载,避免了油缸加载的位移不均匀性,又可以进行上下加载用来模拟正、逆断层,实现了以不同速度进行同步加载的试验。可以根据不同需求,按相似比预制隧道模型进行多个不同角度的垂直、水平单独剪切试验和垂直、水平组合互动联合剪切试验。

隧道结构破坏模拟加载试验装置的工作原理如图8所示。

试验材料选择:土体采用河沙、重晶石、粉煤灰、机油等配制而成,用于模拟断层带处的破碎围岩;隧道衬砌则采用石膏浇筑成型。

试验几何相似比为1∶25,其余各物理量的相似比分别为:弹性模量相似比CE=25,泊松比相似比Cμ=1,應力相似比Cσ=25,应变相似比Cε=1。原型与模型材料的物理力学参数见表2。

4.2 黏滑错动试验结果分析

在洞内位移方面,隧道竖向收敛值纵向分布曲线如图9所示。可以看出在-0.76~0.5 m(-2.6D~1.7D)范围内隧道竖向收敛值明显增大,表明下盘拱顶及上盘仰拱受错动引起的竖向挤压作用显著;7 cm错距下在下盘距断层迹线处隧道竖向收敛值达到最大值3.2 mm,竖向收敛值向两侧逐渐减小趋于平稳,直至两端接近为零,如图9所示。

在隧道破坏形态方面,选取了加载后隧道衬砌穿越断层面受损严重的节段进行分析,如图10所示。

该节段直接穿越断层面,受剪切作用最为明显,在断层迹线处隧道墙脚附近出现条斜裂缝,且斜裂缝开裂方向与断层方向一致,属于沿断层倾角方向的剪切破坏;该节段同时出现环向裂缝,结合隧道结构纵向弯曲变形特征可知,此处的环向裂缝是由于结构纵向拉应力超过抗拉强度引起的,属于纵向拉弯破坏。

5 隧道设防措施研究

国内外针对于应对黏滑错动的设防措施主要有2大原则:一是扩大隧道断面,预留断层错动空间,也为后期预留一定的维修补强空间。二是对隧道结构采用分段的方式,以减小黏滑错动后隧道的破坏范围及程度。黄强兵、刘学增等人也在此方面有过研究,对分段式隧道衬砌在断层黏滑错动下受力变形特征进行了模型试验研究,指出分段式衬砌结构在纵向应变、破坏范围等方面要小于整体式衬砌[19-25]。

主要从断面尺寸扩大和结构分段设计两方面展开分析,以确定合理的设防措施。

5.1 扩大断面

正常情况下地铁隧道内净空为5.38 m×5.45 m(宽×高)。为保证隧道在黏滑错动之后仍有足够的净空,考虑在断层结构设防范围内分别预留错动空间0.65 m(垂直)及四周补强加固空间0.35 m,最终将断面净空尺寸调整至6.45 m×7.0 m(宽×高)。如图11所示。

5.2 分段设防

为减小黏滑错动后隧道结构的影响范围及破坏程度,采用分段的原则对隧道二衬进行设计。综合考虑对隧道维修的经济成本及施工的难易程度,确定二衬节段长度为10 m。

有限元计算分析得到分段式隧道在黏滑错动下的位移及应力响应如图12、图13所示。

对分段式隧道的位移响应进行分析,可以看出隧道二衬在穿越断层面时变形最大,破坏最为明显,但相邻节段间的位移不连续,表明衬砌分段可将黏滑错动下衬砌结构的破坏控制在一定范围内,避免衬砌结构在整体上受到严重破坏。

对分段隧道主应力进行分析,可以看出在断层面附近拱腰出现拉应力,为截面控制部位,应在设计过程中予以针对设防。

综合来看,衬砌节段间变形缝的存在使得相邻节段间的位移和应力均不连续,保持了一定的独立性。表明衬砌分段可以有效控制破坏范围,减弱地层位移对隧道结构的作用,提升隧道的抗错动性能。

6 结 论

1)发生黏滑错动后,隧道衬砌结构沿着纵向发生了“S”状弯曲变形。作用在下盘隧道仰拱及上盘隧道拱顶的围岩压力会有所减小。

2)黏滑错动量为0.65 m时,衬砌结构在上盘80 m、下盘60 m范围区间存在较大塑性变形,结构安全性受到影响,此时断层段隧道结构的设防范围为140 m。

3)位于断层面处衬砌结构发生纵向拉弯破坏和剪切破坏,结构损坏最为严重。

4)采用纵向结构分段及扩大断面的结构设计方式,可有效控制隧道破坏范围,并为后期维修加固预留空间。

参考文献(References):

[1] GREGOR T,GARROD B,YOUNG D.Analyses of underground strutures crossing an active fault in Coronado,California[C]//Proceedings of the 33rd ITA-AITES World Tunnel Congress-Underground Space-The 4th Dimension of Metropolises,Prague,2007:445-450.

[2]LIN M L,JENG F S,HUANG T H,et al.A study on the damage degree of shield tunnels submerged in overburden soil during the thrust faults offset[C]//ASME Pressure Vessels and Piping Division Conference,Vancoucer,BC,Canada,2006:23-27.

[3]劉恺.成兰线跨断层隧道的错动破坏机理研究及地震动力响应分析[D].北京:北京交通大学,2011.

LIU Kai.Research on failure mechanism and seismic dynamic response of cross fault tunnel on Chengdu Lanzhou Railway[D].Beijing:Beijing Jiaotong University,2011.

[4]盛越.地铁隧道跨逆断层支护结构抗错动影响分级评价研究[D].成都:西南交通大学,2016.

SHENG Yue.Research on classification evaluation of anti dislocation effect of subway tunnel supporting structure across reverse fault[D].Chengdu:Southwest Jiaotong University,2011.

[5]李林.隧道穿越断裂带地震响应特性及抗震措施研究[D].成都:西南交通大学,2014.

LI Lin.Study on seismic response characteristics and seismic measures of tunnel crossing fault zone[D].Chengdu:Southwest Jiaotong University,2014.

[6]祁彬溪,王凡,陈捷翎.粘滑断层错动作用下穿越断层隧道结构响应数值模拟[J].建筑结构,2020,50(S2):753-758.

QI Binxi,WANG Fan,CHEN Jieling,Numerical simulation on structural response of tunnel passing through fault under the action of stick slip fault dislocation[J].Building Structure,2020,50(S2):753-758.

[7]安韶,陶连金,边金.跨逆断层乌鲁木齐地铁2号线抗断设计过程研究[J].东南大学学报(英文版),2020,36(4):425-435.

An Shao,Tao Lianjin,Bian Jin,Study on anti-faulting design process of Urumqi subway line 2 tunnel crossing reverse fault[J].Journal of Southeast University(English Edition),2020,36(4):425-435.

[8]崔光耀,宋博涵,王明年,等.基于能量守恒原理的跨活動断层隧道抗错断设计方法研究[J].土木工程学报,2020,53(S2):309-314.

CUI Guangyao,SONG Bohan,WANG Mingnian,et al.Study on the anti-breaking design method of tunnel across active fault based on the energy balance method[J].China Civil Engineering Journal,2020,53(S2):309-314.

[9]汪振,钟紫蓝,赵密,等.正断型断裂模拟及其对山岭隧道影响研究[J].岩土工程学报,2020,42(10):1876-1884.

WANG Zhen,ZHONG Zilan,ZHAO Mi,et al.Simulation of normal fault rupture and its impact on mountain tunnels[J].China Civil Engineering Journal,2020,42(10):1876-1884.

[10]阎锡东,高军,韩翡,等.隧道穿越活动断裂带风险评价研究及工程应用[J].现代隧道技术,2020,57(5):10-22,60.

YAN Xidong,GAO Jun,HAN Fei,et al.Risk evaluation of the tunnel passing through active fault zone and engineering application[J].Modern Tunnelling Technology,2020,57(5):10-22,60.

[11]邓起东,卢造勋,杨主恩.城市活动断层探测和断层活动性评价问题[J].地震地质,2007,29(2):189-199.

DENG Qidong,LU Zaoxun,YANG Zhuen.Urban active fault detection and fault activity assessment[J].Seismology and Egology,2007,29(2):189-199.

[12]张伟喜.乌鲁木齐地铁1号线穿越地质断层的技术措施[J].都市快轨交通,2017,30(2):58-62.

ZHANG Weixi.Technical measures of crossing active geological fault adopted for line 1 of Urumqi metro[J].Urban Rapid Rail Transit,2017,30(2):58-62.

[13]孙礼超,万佳文,秦昌,等.活动断层粘滑错动条件下地铁隧道结构的受力特性分析[J].路基工程,2018,36(2):82-86.

SUN Lichao,WAN Jiawen,QIN Chang.The structure of subway tunnel under the condition of active fault viscous slip analysis of force characteristics[J].Subgrade Engineering,2018,36(2):82-86.

[14]梁文灏,李国良.乌鞘岭特长隧道方案设计[J].现代隧道技术,2004,41(2):1-7.

LIANG Wenhao,LI Guoliang.Design of the tunnel project of Wushaoling[J].Modern Tunneling Technology,2004,41(2):1-7.

[15]何登发,鲁人齐,黄涵宇,等.长宁页岩气开发区地震的构造地质背景[J].石油勘探与开发,2019,46(5):993-1006.

HE Dengfa,LU Renqi,HUANG Hanyu,et al.Tectonic and geological background of the earthquake hazards in Changning shale gas development zone,Sichuan Basin,SW China[J].Petroleum Exploration and Development,2019,46(5):993-1006.

[16]何强,李录明,赖敏,等.凤凰山地区蒲江-新津-德阳-隐伏断裂反射波法地震勘探与断裂活动性研究[J].地震地质,2004,26(4):706-715.

HE Qiang,LI Luming,LAI Min,et al.Seismic reflection surveying of the Pujiang-Xinjin-Deyang buried fault in Fenghuangshan area and the study of fault activity[J].Seismology and Geology,2004,26(4):706-715.

[17]孟立朋,彭远黔,冉志杰,等.浅层地震勘探在工程选址中的应用及断层活动性鉴定[J].华北地震科学,2016,34(4):20-27.

MENG Lipeng,PENG Yuanqian,RAN Zhijie,et al.Shallow seismic exploration and fault activity identification in engineering site[J].North China Earthquake Sciences,2016,34(4):20-27.

[18]王世元,何强,刘韶,等.2017年1月28日四川筠连地震震害特征与孕震构造[J].地球科学前沿,2018,8(1):60-67.

WANG Shiyuan,HE Qiang,LIU Shao,et al.Damage character and magnitude discussion for the Junlian earthquake on January 28,2017 in Junlian,Western China[J].Advances in Geosciences,2018,8(1):60-67.

[19]李鹏.活动断层区公路隧道抗错断结构设计的研究[D].重庆:重庆交通大学,2009.

[20]劉学增,王煦霖,林亮伦.45°倾角正断层粘滑错动对隧道影响试验分析[J].同济大学学报(自然科学版),2014,42(1):44-50.

LIU Xuezeng,WANG Xulin,LIN Lianglun.Modeling experiment on effect of normal fault with 45° dip angle stick-slip dislocation on tunnel[J].Journal of Tongji University(Natural Science),2014,42(1):44-50.

[21]刘学增,林亮伦,桑运龙.逆断层粘滑错动对公路隧道的影响[J].同济大学学报(自然科学版),2012,40(7):1008-1014.

LIU Xuezeng,LIN Lianglun,SANG Yunlong.Effect of thrust fault stick-slip rupture on road tunnel[J].Journal of Tongji University(Natural Science),2012,40(7):1008-1014.

[22]黄强兵,彭建兵,门玉明,等.地裂缝对地铁明挖整体式衬砌隧道影响机制的模型试验研究[J].岩石力学与工程学报,2008,27(11):2324-2331.

HUANG Qiangbing,PENG Jianbing,MEN Yuming,et al.Model test study on effect of ground fissure on open-cut metro tunnel with integral lining[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(11):2324-2331.

[23]张志超,王进廷,徐艳杰.跨断层地下管线振动台模型试验研究(Ⅰ)——试验方案设计[J].土木工程学报,2011,44(11):93-98.

ZHANG Zhichao,WANG Jinting,XU Yanjie.Shaking table test for cross-fault buried pipelines(Ⅰ):Model design[J].China Civil Engineering Journal,2011,44(11):93-98.

[24]冯启民,郭恩栋,宋银美,等.跨断层埋地管道抗震实验[J].地震工程与工程振动,2000,20(1):56-62.

FENG Qimin,GUO Endong,SONG Yinmei,et al.Aseismic test of buried pipe crossing fault[J].Earthquake Engineering and Engineering Vibration,2000,20(1):56-62.

[25]黄强兵,彭建兵,范文,等.西安地铁2号线沿线地裂缝未来位错量估算及工程分级[J].工程地质学报,2007,15(4):469-474.

HUANG Qiangbing,PENG Jianbing,FAN Wene,et al.Estimation of the maximum displacement of ground fissures along Xian Metro Line No.2 and its engineering classification[J].Journal of Engineering Geology,2007,15(4):469-474.

猜你喜欢
围岩分段断层
如何跨越假分数的思维断层
2018年—2020年山西省普通高考成绩分段统计表
复杂隧道围岩安全性及其评价方法
基于松动圈理论的隧道初期支护时机分析
分段函数的常见题型及其解法
论井田断层的连接
小议地层倾角大于或小于断层倾角时的断层特征
直立断层平动和旋转运动引起的重力变化
例谈分段函数单调性问题的解决
寻求分段函数问题的类型及解法